Rule #1: Understand Craft Needs
Leaders don't fail because they don't care. They fail because they assume they already understand the work..
I've watched leaders walk into the field with a title, a schedule, a work package, and a well-developed plan...and still fail to understand what the craft actually needed to execute the work successfully.
Not because they weren't intelligent or because they didn't care. Because they never stopped to ask that specific question.
- • The drawings were complete.
- • The schedule had been approved.
- • The procedures had been reviewed.
- • The work package had been released.
- • The JHA was signed off.
Everything appeared ready, yet execution still suffered.
Why?
Because work is performed by people—not schedules, procedures, or project plans.
My perspective on this was shaped long before I became a project manager. I came from the craft. As a journeyman ironworker, I learned firsthand that the people performing the work often have insights that never make it into a schedule, procedure, or meeting. That experience has stayed with me throughout my career and continues to influence how I approach leadership and project oversight today.
The Difference Between Planning and Execution
Organizations invest enormous amounts of time developing plans.
- • Engineering develops drawings.
- • Project controls develop schedules.
- • Operations write procedures.
- • Management establishes milestones.
All of those things are important - But none of them perform the work.
Execution happens in the field - That's where plans encounter reality:
Craft may discover access limitations that weren't obvious during planning.
- • Materials may not arrive in the sequence the schedule assumed.
- • Equipment may be technically available but impractical to use in the actual work environment.
- • Weather changes.
- • Interfaces change.
- • Conditions change.
Good leaders recognize that execution is where assumptions are tested, and that's why understanding the needs of the people performing the work is so critical.
The Question That Changes Everything
Throughout my career, I've found one question consistently produces better conversations than almost any other:
"Can you help me understand what you need?"
It's a simple question, but it changes the entire relationship between leadership and the workforce.
Instead of assuming the problem, you begin understanding it.
Instead of directing, you begin listening.
Instead of defending the plan, you begin improving it.
That single question often uncovers information that would never appear in a project report.
- • Missing tools.
- • Conflicting priorities.
- • Incomplete information.
- • Resource limitations.
- • Unnecessary obstacles.
- • Unrealistic schedule expectations.
- • Emerging risks.
Not because people were hiding them, but because nobody had asked them.
Understanding Doesn't Mean Lowering Standards
Some leaders mistakenly believe that understanding craft needs means compromising expectations.
It doesn't.
The standard doesn't change, accountability doesn't change, and expectations don't change.
What changes is the quality of the decisions leaders make.
When leaders understand the work before directing it, they remove obstacles instead of creating them. They solve problems instead of simply assigning responsibility for them. They become partners in execution rather than observers of execution.
That's not weaker leadership.
It's better leadership.
Trust Is Built Before It's Needed
There's another benefit that often goes unnoticed;
When people see that leadership genuinely wants to understand the work, trust begins to develop.
Craft professionals become more willing to identify emerging concerns.
Supervisors become more comfortable discussing constraints.
Communication improves because people recognize they're being heard rather than judged.
That trust becomes invaluable when the project encounters difficult decisions later.
Leaders who understand the work earn credibility.
And credibility is one of the most valuable tools a leader can carry into the field.
Better Decisions Begin with Better Understanding
I've spent much of my career overseeing complex construction, decommissioning, and industrial projects. The organizations that consistently performed best weren't necessarily the ones with the most detailed procedures or the most sophisticated reporting systems. They were the ones whose leaders understood what it actually took to perform the work successfully.
Because better understanding produces better decisions.
Better decisions produce better execution.
And better execution produces better outcomes.
For me, that's always been Rule #1: Understand Craft Needs.